Skip to main content

Compost and topsoil calculator

Use the compost and topsoil calculator for site development planning.

Our compost and topsoil calculator can help you determine the compost or topsoil needs for site development projects. This includes completing the permitting application for meeting the post-construction soil standard.

Use it to calculate:

  • Custom compost amendment rate
    • This is the number of inches of compost to be layered over the site surface and mixed in
  • Amount of compost needed (in cubic yards)
  • Amount of site soil to be stockpiled (in cubic yards)
  • Amount of imported topsoil needed (in cubic yards)

STEP 1

Visit the King County Post-Construction Soil Standard page to understand code requirements and soil management options.

STEP 2

Determine which soil management option(s) are needed for each area marked on your project site map.

STEP 3

Choose Turf or Planting beds and determine Amendment rate of compost needed.

For soil treatment options that involve adding compost to the soil, you need to choose either the pre-approved amendment rate of application or a custom amendment rate. A custom amendment rate will be lower than the pre-approved rate for most sites. To calculate a custom amendment rate, you will need to enter information from laboratory tests of the site soil and specified compost products.

expand_less