Area 8. Mercer Slough
We are installing a new sewer pipe underneath the Enatai hillside between the Sweyolocken Pump Station and Enatai Beach Park and putting in a new lining on the existing pipe along Lake Washington between Enatai Beach Park and the mouth of the Mercer Slough.
About the Area 8. Mercer Slough Project
Read about upcoming construction in and around Mercer Slough. This StoryMap features information for this public area that includes:
- What we are building
- What to expect during construction
- What you’ll see when the work is done
Construction Reference Guide
Learn what to be aware of if you are a neighbor, resident, commuter, boater, biker, pedestrian or park user in the project area.