Taxiway A11 Rehabilitation
The Taxiway A11 repaving project will replace the current pavement in this area that is failing and replace it with new pavement, meeting the current design standards for the aircraft that use the A11 interstation. The project will also install in-pavement runway guard lights. This will increase safety during dark and low visibility conditions.
Objectives and Goals
- Reduce FOD (Foreign Object Debris) generation
- Improve safety
- Increase the pavement life span
- Complete the project as sustainably as possible
Schedule
- Design: Completed first quarter 2024
- Bidding: Second quarter 2024
- Construction: Second and third quarter 2024
Documents and recordings
Documents and recordings related to this project will be posted as soon as practical.