NE Big Rock Road Overlay Project

Paving expected in spring 2026

Cracked and potholed concrete road with yellow and white striping

3.23 miles of NE Big Rock Road will be paved between the Duvall City Limits and Kelly Road NE in the spring of 2026. The current surface is cracked and potholed and is ready to be repaved. 

Status update

Road Services plans to pave NE Big Rock Road between the Duvall City Limits and Kelly Road NE in the spring of 2026. Paving is a moving operation, and flaggers will direct two-way traffic through a single open lane. We expect delays of up to 30 minutes. 

Paving is weather dependent and can be rescheduled due to crew, material, or equipment availability. 

When this work is scheduled, the dates will be posted on this website, the Road Resurfacing website, and on our MyCommute map. We’ll also email or text a Road Alert to you if you’ve registered for that service.

Project overview

Road Services plans to pave 3.23 miles of NE Big Rock Road between the Duvall City Limits and Kelly Road NE. This rural two-lane road is in poor condition and is ready for fresh pavement. There are two sections of this roadway that were previously treated with High Friction Surface Treatment and will not be paved as part of this project. There will be some additional spot repairs in three locations and some prep work along the road shoulder. Crews will paint permanent striping after the new roadway has cured.

24/7 Road Helpline contact information

24/7 Road Helpline

Report road maintenance and safety issues in unincorporated King County 24 hours a day at 206-477-8100 or 1-800-527-6237.

Project location map

Map graphic of 3.23 miles of NE Big Rock Road will be paved between the Duvall City Limits and Kelly Road NE.

3.23 miles of NE Big Rock Road will be paved between the Duvall City Limits and Kelly Road NE.

What is paving overlay?

An overlay, also known as a topcoat or resurfacing, is a process where a new layer of asphalt is applied in the same location as an existing paved surface. This technique is typically used when the existing pavement has minor damage like cracking or potholes, but the underlying base is still structurally sound.

Paving overlay process:

  • Crews will use machines to grind and remove over two inches of existing pavement. This will create a clean and uniform surface at the proper depth for the new pavement.
  • The roadway will be cleaned of loose debris, dirt, and any other loose or damaged materials to make sure the surface of the road is prepped for the new top layer.
  • Repairs will be made to any problems in the subsurface of the road.
  • A thin layer of bonding agent, called tack coat, is applied to the prepared surface to create a strong adhesive bond between the old and new layers of asphalt.
  • Specialized equipment spreads the new hot-mix asphalt over the tack-coated surface.
  • Rollers are used to compact the newly laid asphalt to keep the surface of the road smooth, durable, and uniform.
  • Once the new asphalt has cooled and set, crews will paint traffic temporary markings and lane striping.
  • About three weeks after final paving and the road has time to cure, crews will return for final traffic markings and lane striping.

What to expect during construction:

Paving is a moving operation, and flaggers will direct two-way traffic through a single open lane. Travelers including drivers, bicyclists, and pedestrians should expect delays of up to 30 minutes.

  • Noise, dust, smells, and vibrations during work.
  • Access to business and homes will always be maintained, though short delays are likely. We'll let you know in advance about work. We'll also give you a direct contact for your questions.
  • Paving is scheduled between 7 am and 6 pm Monday to Friday, with some evening and weekend work if needed.
  • Road Services will coordinate with the Riverview School District, emergency services, US Mail, garbage/recycling companies, and freight to inform them of the work. 

Project budget

The total budget including design, construction, and construction management for this project is $2.2 million and is funded through the Puget Sound Regional Council and King County local fund.

Project timeline

  • Design complete: summer 2025
  • Construction to begin: late spring 2026 (anticipated)
  • Construction complete: Early summer 2026 (anticipated)
 

Frequently Asked Questions

What is the average daily traffic on NE Big Rock Road?

On average, 3,100 vehicles travel on NE Big Rock Road each day. 

Will I be able to travel on NE Big Rock Road during paving?

Yes. Please expect delays of up to 30 minutes as flaggers move alternating two-way traffic through a single open lane. 

Will emergency services, Snoqualmie Valley Transit (SVT), and school buses have access to the road during construction?

Yes. All vehicles will have access to NE Big Rock Road during paving. Flaggers will prioritize SVT, school buses, and emergency vehicles, though there will be delays. 

 

Photos

Straight road with yellow stripes down the middle showing cracks in the pavement and patching over potholes.

This photo, taken between 117th Street NE and Kelly Road NE shows the cracks in the pavement and patching over potholes. After the project, the road will be smooth for the drivers, pedestrians, and bicyclists who use the road. 