Skip to main content
close

KingCounty.gov is an official government website. Here's how you knowexpand_moreexpand_less

account_balance

Official government websites use .gov

Website addresses ending in .gov belong to official government organizations in the United States.

lock

Secure .gov websites use HTTPS

A lock lock or https:// means you've safely connected to the .gov website. Only share sensitive information on official, secure websites.

Stormwater drainage resources for professionals

Requirements and standards for designing surface and stormwater management systems in King County to mitigate the impacts of new development and redevelopment on natural and existing man-made drainage systems.

Important notice about projects permitted under earlier versions of the Surface Water Design Manual (SWDM)

The 2021 SWDM (amended 2024) is the most current version.

Per requirements in King County’s Phase 1 Municipal Stormwater Permit (effective date August 1, 2019), projects permitted under the 2016 SWDM that have not started construction by July 1, 2026, and projects permitted under earlier versions of the SWDM that have not started construction by July 1, 2021, must be revised to comply with the requirements of the 2021 SWDM, or subsequent versions as directed by state regulations. Revisions will need to be approved by the Permitting Division of the King County Department of Local Services (DLS-PD), or its successor agency prior to construction.

* “Started construction” means, the site work associated with, and directly related to the approved project is at a stage where rough grading is complete, or utilities are installed. For rough grading to be considered complete, elevations are within 1 foot of final design elevations.

expand_less